Bank of Holly Springs
Article Image Alt Text

Hudsonville Road pipe replacement

Photo by Sue Watson

Jon Woods Construction of Red Banks replaced a rusted out pipe under Hudsonville Road over the weekend. A crew installed a preformed concrete headwall to connect to a five-feet diameter drain pipe Monday. Those assisting with the project include Leroy Mays, David Woods, Jon Woods, Wally Briscoe, Ryan McAlexander, Darrin Milan, Jonathan Woods and Tymon Pigues.

Holly Springs South Reporter

P.O. Box 278
Holly Springs, MS 38635
PH: (662) 252-4261
FAX: (662) 252-3388
www.southreporter.com