Bank of Holly Springs
Article Image Alt Text

Photo by Sue Watson

Erosion control

Ste-Bil (Steve Billingsley) Construction of Waterford is working on an Emergency Watershed Protection project near AutoZone and Sonic in Holly Springs. The project will stabilize the ditch bank. The much-needed project is also improving the looks of the property along Highway 7 South in the city.

Holly Springs South Reporter

P.O. Box 278
Holly Springs, MS 38635
PH: (662) 252-4261
FAX: (662) 252-3388
www.southreporter.com